Vendor Management

Holding the Line on Licensing

Most of my infrastructure work is about building things. This one was about refusing to let a vendor rebuild my cost structure for me. Two licensing fights landed in the same stretch, VMware under Broadcom and Veeam’s push off socket-based licensing, and both came down to the same discipline: know where the vendor is trying to take you, and know your own entitlements well enough to treat the contract as leverage instead of a formality.

completed February 2026

Turning Up Multi-Site Fiber

Bringing 1Gbps fiber to four manufacturing plants reads like a procurement line item until you are the one signing the acceptance form. The plants needed the bandwidth to keep up with growing demand, the contracts specified 1Gbps, and Verizon was ready to call each circuit done. I made a validated throughput test, not a lit circuit, the condition of my signature.

completed January 2024